Click on the above image to see a larger image of the parlor in 1975.

Below are pictures during the first week of demo 10/98.


Some pictures of the parlor before the plaster work was completed. 5/99

Some pictures of the parlor before the plaster work was completed. 5/99

Some pictures of the parlor before the plaster work was completed. 5/99

Above the Parlor has new drywall and spot plaster completed before the new hardwood floors were installed after the home tour 6/5/99.

Pics from the home tour above and below. 6/5/99

A current picture of the Parlor. Notice the new hardwood floors.8/99

New pictures showing the 10ft. Christmas Tree in the Parlor. 12/99

The missing mantel is completed. A BIG Thanks goes out to David Spagna and Dave Diehl for helping us install the mantle and providing extra marble to cut pieces from. 5/06/01

Wayne, David and Spencer take a break after setting all of the pieces except for the top. 5/05/01

The plaster molding has been installed, we have painted. Christmas 2000.

The plaster molding has been installed, we have painted. Christmas 2000.

Christmas 1999.

Our great neighbor David Spagna is helping us install the missing mantle in the Parlor. Hopefully only one more weekend until it is completed. It will be a working fireplace as it is open all the way to top. 5/02/01

We are installing the missing mantle as we have found enough pieces in the basement to install it. Except for the hearth and the top, They are new pieces. 4/22/01