Click on the above image to see a larger image of the parlor in 1975.
Below are pictures during the first week of demo 10/98.
Some pictures of the parlor before the plaster work was completed. 5/99
Some pictures of the parlor before the plaster work was completed. 5/99
Some pictures of the parlor before the plaster work was completed. 5/99
Above the Parlor has new drywall and spot plaster completed before the new hardwood floors were installed after the home tour 6/5/99.
Pics from the home tour above and below. 6/5/99
A current picture of the Parlor. Notice the new hardwood floors.8/99
New pictures showing the 10ft. Christmas Tree in the Parlor. 12/99
The missing mantel is completed. A BIG Thanks goes out to David Spagna and Dave Diehl for helping us install the mantle and providing extra marble to cut pieces from. 5/06/01 |
Wayne, David and Spencer take a break after setting all of the pieces except for the top. 5/05/01 |
The plaster molding has been installed, we have painted. Christmas 2000.
The plaster molding has been installed, we have painted. Christmas 2000. |
Christmas 1999. |
Our great neighbor David Spagna is helping us install the missing mantle in the Parlor. Hopefully only one more weekend until it is completed. It will be a working fireplace as it is open all the way to top. 5/02/01 |
We are installing the missing mantle as we have found enough pieces in the basement to install it. Except for the hearth and the top, They are new pieces. 4/22/01 |