The basement has been finished off for Wayne's new office 5/05

The basement has been finished off for Wayne's new office 5/05
 

The new mantle is installed. -W 6/04

The new mantle is installed. -W 6/04

 

The side yard is coming together. -W 9/24/02

The side yard is coming together. -W 9/24/02

The side yard is coming together. -W 9/24/02

We are patiently waiting for our landscaper regrade the side and back yard, add a new flagstone patio and path. 05/02

We are having a landscaper regrade the side and back yard. Add a new flagstone patio and path. 05/02

We are having a landscaper regrade the side and back yard. Add a new flagstone patio and path. 05/02

I finally got to add the railing last weekend. -W 9/24/02

New side steps being built, a BIG thanks goes to David Margolis for all of his help!- 10/06/01

 

We were recently on HGTV - Restore America. Click to see the larger screen shot of the web site info. 5/20/02

Julie has been busy stripping the 3rd floor stairs. Peel Away 1 is the best stripper available!. 05/02

Julie has also been busy stripping the side door. 05/02

 


Current Picture
Before Picture

The parlor is completed for the June 2001 House Tour. 6/03/01 Click here for a larger photo.

A picture of the parlor before the plaster work was completed. 5/99


Our great neighbor David Spagna helped us install the missing mantle in the Parlor. Bradbury & Bradbury border added. Julie, her mother Carol and Lynn David sewed the gold curtains. 6//01

We are installing the missing mantle as we have found enough pieces in the basement to install it. Except for the hearth and the top, They are new pieces. 4/22/01

 

Current Picture
Before Picture

Sitting room with the wardrobe installed and the floors finished. 12/25/00

This was the condition of the room before we purchased the house. Yes that is an exposed brick wall with a fireplace that had been closed up. 9/98

We are sleeping in our Master bedroom. (Julie says, "Yes it is Brown 'Sherwinn Williams - Heavy Metal', based off of a color we found in the bedroom closet and we suspect it might the original color) 12/25/00

Above, is the second floor front room soon to be our master bedroom. It has a great view of the park and is about 25 feet wide and 15 feet deep.
October 1998

New plaster molding installed, spackled, sanded, primed and painted to match the original plaster molding found in the room. 12/00

A picture showing the condition of this room when we purchased the house showing the exposed lathe and broken up remaining pieces of the original plaster molding. 10/98

The Master Bathroom is 99% complete. There use to be 3 doors going into the bathroom. We duplicated the wood paneling and wood trim to capture the original character of the room. 1/15/01

The door was removed and it is the same wall where the tile and tub is located. 10/98