Masterbedroom 11/25/00
Same view as the picture to the left.

Above, is the second floor front room soon to be our master bedroom. It has a great view of the park and is about 30 feet wide and 15 feet deep.
October 1998

Masterbedroom 11/25/00

Reverse angle of the master bedroom looking out to the park.(angle1) 2/99

Masterbedroom 11/25/00

 

We are getting closer as we have painted the Master Bedroom. Almost finished painting, trim the wood work takes a long time. 11/13/00.
A big thanks to one of our neighbors (Dave S.) He helped Julie and I install this mantel that we found in pieces in the basement. 10/00.

We are getting closer as we have painted the Master Bedroom. Almost finished painting, trim the wood work takes a long time. 11/13/00.

Our master bedroom! It is storing the wood trim new and old that was
stripped by Wood Stripping company here in St. Louis.

Keep in mind those boards are about 10 - 11 feet long.
They go around the windows you see in the back ground. 3/00


This room is next on list. it has been spot plastered and primed. We are in mist of stripping 5 layers of paint off of the window & door wood trim.7/99

Some demo pictures. Julie, myself and her intown family members removed 6 dump truck loads of plaster and lath. Below are pictures during that 1st week of home ownership.

Above, is the seceond floor front room soon to be our master bedroom. It has a great view of the park and is about 30 feet wide and 15 feet deep. 10/98